What's new

Selected highlights. For the full technical changelog, see the product spec.

v2.8.0 · 2026-09-10

  • Simplified workspace: Views, Plan actions, Project overview, Task filters, and the active schedule now have clearly separated zones.
  • New task remains immediately available while related editing, sharing, settings, and file actions are grouped together.
  • Project progress and the next milestone stay visible; detailed metrics, stages, and milestones expand only when needed.
  • Task display options now live together, and the compact phone layout keeps secondary controls from overwhelming the screen.

v2.7.0 · 2026-09-01

  • Bulk edit: select many tasks and apply a status, shift dates by N days, set a start or end date, mark or unmark milestones, or append the same note.
  • Status report export: a printable weekly HTML or Markdown report with headline numbers, recent completions, in-progress, blocked and overdue work, what's next, and upcoming milestones — plus a one-click copy for email.
  • Calendar export (.ics): send open tasks, all dated tasks, or milestones only to Outlook, Google Calendar, or Apple Calendar as all-day events.
  • New Share menu in the header collects reports, calendar, and task list (.csv / .xlsx) exports; all outputs respect your current filters and search.

v2.6.2 · 2026-08-31

  • Expanded sample dataset: about 39 tasks across nine owners, built to exercise every view.
  • Long dependency chains with fan-in/fan-out so the Network view shows a real critical path, and overlapping assignments so the Owner workload heatmap shows hot weeks.
  • Includes overdue, blocked, deferred, and undated tasks plus milestones across stages, so every grouping in My tasks and both strips have content.
  • User guide (v1.3.1) updated to explain what the sample plan demonstrates.

v2.6.1 · 2026-07-16

  • Landing page and FAQ now highlight the five views: Week, Day, Timeline, Network, and My tasks/Owner workload.
  • New feature cards for the dependency network, owner workload heatmap, and baseline variance on the home page.
  • User guide updated to explain the Capture baseline / Clear baseline controls in Settings.

v2.6.0 · 2026-07-15

  • New Network view: a zoomable dependency graph that highlights cycles and the critical path. Available when your plan includes a Depends_on column.
  • Baseline capture: freeze a snapshot of your schedule in Settings, then compare Start/End dates in the Task drawer to see slip or gain versus the baseline.
  • My tasks view now supports multi-owner selection plus a type-ahead search field, so you can quickly focus on any combination of team members.
  • Owner workload heatmap: see task density per owner per week, and click any cell to jump to that week in the timeline.

v2.5.0 · 2026-07-13

  • New "+ New task" button in the app header — add tasks that aren't in your spreadsheet yet without leaving SheetTimeline.
  • Added tasks show up immediately on the week board, day list, and timeline (dated ones on the calendar, undated ones in the Unscheduled panel).
  • On "End session & export", new tasks are appended as fresh rows at the bottom of your original .xlsx — existing rows and formulas stay untouched.
  • Task drawer gains a Remove button for tasks you added in-app, so you can drop one before exporting.
  • "All tasks" CSV/XLSX downloads and the Changes tray now include newly added tasks.

v2.4.0 · 2026-07-12

  • Launched publicly as SheetTimeline.
  • New marketing landing page at /; the app moved to /app (existing sessions carry over untouched).
  • Added privacy, terms, copyright, and this What's new page.
  • Anonymous visitor + session counters power the stats on the landing — no plan data is ever sent.

v2.3.0 · 2026-07-12

  • Added a backlog section to the spec covering future ideas (multi-plan library, accounts, monetization).

v2.2.0 · 2026-07-12

  • Round-trip export now preserves your plan's original status vocabulary and writes back to the mapped columns — even for plans without an ID column (row numbers can be used instead).

v2.1.0 · 2026-07-12

  • Stage strip: stages where every task is deferred no longer show a misleading 0%. "We are here" only marks stages with unfinished, non-deferred work.
  • Clicking a stage with no dated tasks now toasts to explain instead of silently doing nothing.

v2.0.0 · 2026-07-12

  • Generalized into a plan-agnostic viewer: only ID, Title, and Status are required.
  • Added a mapping wizard for custom column names and status vocabularies, plus saveable plan profiles.
  • Added workstream color overrides, app timezone setting, and a downloadable Excel template + sample dataset.